Paper Bridge-project.pdf - Section 1: Revisiting Yesterday's Work

  • paper bridge project
  Paper Bridge-project.pdf
  Paper Bridge-project.pdf
Loading resource...

Predicting Bridge Strength via Data Analysis (Day 2 of 2)

Unit 3: Linear Functions
Lesson 19 of 20

Objective: SWBAT collect data to model the dead and live weight of paper bridges and use the line of best fit to make predictions from the data.

Big Idea: On Day 2 of this lesson the students focus on the analysis of their data and scatter plot, present their findings, and compare their findings with other students.

  Print Lesson
2 teachers like this lesson
Math, Hands On, Math, Analysis, Compare Student work, Closure, paper bridges, pennies, write the equation of a line of best fit, prediction equation, scatter plot
  50 minutes
paper bridge project
Similar Lessons
What is Algebra?
Algebra II » Modeling with Algebra
Big Idea: Algebra is built on axioms and definitions and relies on proofs just as much as geometry.
Fort Collins, CO
Environment: Suburban
Jacob Nazeck
Leap of Faith!
Algebra I » Bridge to 10th Grade
Big Idea: Students will find a linear relationship between the number of rubber bands and height.
Washington, DC
Environment: Urban
Noelani Davis
Rabbit Run -- Day 2 of 2
Algebra I » Quadratics!
Big Idea: Students look for and express regularity in repeated reasoning (MP8) as they generalize a formula.
Boston, MA
Environment: Urban
Amanda Hathaway
Something went wrong. See details for more info
Nothing to upload